Put the rectangular sensor (the one with the long cable) on the tree. The spike should point towards the roots.
Connect the BNC connector to the (black) amplifier box.
Connect the soil sensor (cylindrical) to the amplifer box.
Tie a loose rope around the tree. The rope will help you to keep a constant distance between the tree and the soil sensor. Move the soil sensor around the tree by small steps, making sure that the rope remains tightened.
Make a measurement at each sensor position.
SD02 piezo sensor with 6 m cable
Soil sensor
Dual amplifier box
Battery box
Rubber hammer
Steel hammer
Evaluation software
Specification |
Details |
|---|---|
Time required for one measurement |
~ 1 hour |
Hammer |
100 g |
Measured time precision |
± 2 μs |
Number of sensors |
2 |
Sensors |
starter |
SD02 piezo sensor |
receiver |
high frequency geophone |